All Projects

Filter
  • Show All
  • Utilities
  • Street & Bridge
  • Parks
  • Earthwork
  • Concrete
Mesa Ridge & Syracuse St
Earthwork utilities and street work for the new King Supers Grocery Store development. Read More
Indiana Ave & Illinois Ave Railroad
Building new roadway over the railway with surface level crossing systems, adding a traffic light at Santa Fe Ave intersection. Read More
PLSD Sewer Outfall
The PLSD Sewer Outfall project was an emergency operation to fortify the Sanitary Sewer Crossing of Ice Cave Creek. A recent flood event had exposed the existing pipe causing ... Read More
28th St & Colorado Ave Intersection
Removing and replacing curb sidewalks streetscapes and traffic lighting through major intersections.  Read More
S Cheyenne Canyon Bridge Replacement
Development of existing bridge structure and realign the creek and install new road out pedestrian bridges over Cheyenne Creek. Read More
Woodmoor Arapahoe Well No 22
This project involved the installation of pumps and hardware in a previously drilled well, coupled with the construction of a durable pump house made from CMU bl... Read More
West Fillmore Culvert Replacement
Installation of new storm drain 72" RCP pipe through Jacking and boring method underneath Fillmore Street in Colorado Springs. Includes concrete Head and Tail walks ... Read More
Granite Bridge Construction
Demolition and rehabilitation of old bridge structure, adding riprap improving waterways over Arkansas River. Read More
Wind Crest Senior Living Community Expansion
The major part of the project is concrete construction structural. Read More
CDOT Bailey US285 Safety Imp
The project enhanced SH285's safety by removing the existing median and curbs, installing a CDOT type 9 concrete barrier, adding new curbs, and replacing pavement fo... Read More
Orchard Road Widening
Large-diameter storm system to provide drainage for 700-acre commercial development, also retention pond structures for flood control, water main, sewer main, and cu... Read More
CDOT Region 2 SH67 Safety Imp
This project included widening the roadway and realigning it at two locations along Highway 67. This project also involved creating a 40-foot-high slope cut alon... Read More
Centerplace Dr. Apartments
This project was an impressive 4,500 yards of concrete covering 10 apartment buildings, 12 garages, a clubhouse, and a fitness center. Despite a delayed start and fa... Read More
Monument Jackson Creek Apartments
Native Sun Construction delivered exceptional results on the Jackson Creek Apartments, pouring 2,800 yards of concrete for 8 large apartment buildings and a fitness ... Read More
Front Range Trail at Castle Rock
This project in Castle Rock involved the construction of 18,480 feet of concrete trail, integrating various structural and landscaping elements to enhance accessibility and ae... Read More
Elan Apartments Project
New apartment complexes in congested urban areas our scope included earthwork, stormwater, sewer, water, and all concrete. Read More
Wastewater System Improvements
This project entailed the installation of 8,000 feet of 24-inch SDR35 sewer pipe, along with the placement of 50 manholes. A significant segment of the project, spanning 300 f... Read More
The Village at Solid Rock
Demolition of existing structure, earthwork and utilities for new apartment building in urban areas. Read More
Baseline & Foothills Trunk Sewer Line
Native Sun Construction masterfully executed the installation of 7,350 linear feet of gravity sanitary sewer system, with pipe sizes ranging from 10 to 36 inches, across chall... Read More
Aberdeen Ridge Senior Living
Construction of new development for senior living complex 60 thousand of earthwork and thousands of feet of storm drain, sewer, and water line infrastructure. ... Read More
Town of Elizabeth Street Improvement
Rehabilitation of existing roadways replacing sewer, water, storm improvements, new curb gutters, sidewalks and asphalt paving. Read More
OLIV Boulder
Concrete only scope parking garage. Read More
Albion Apartments
This project consisted of a high rise in downtown Denver. Native Sun crews completed the structural, site work and flatwork concrete for this project within tigh... Read More
Beckers Lane Bridge Replacement
Native Sun Construction expertly replaced an outdated bridge with an advanced prestressed concrete system, enhancing its dimensions for modern demands. Our appro... Read More
Paseo Bridge Replacement and Trail
The Paseo Rd Bridge and Trail Project was successfully completed by Native Sun Crews. We replaced the aged arch culvert beneath Paseo Street, conducted necessary... Read More
Edison at Chapel Hills
Earthwork, concrete, utilities for new apartment complex in Colorado Springs. Read More
64th Ave & E470 Water Line
Our team at Native Sun Construction skillfully completed a critical infrastructure project, laying a 3,500-foot 24" water main beneath the E470. Encased within a... Read More
Falcon Commerce Center
Large diameter storm system to provide drainage for 700-acre commercial development, also retention pond structures for flood concrete, water main, sewer main, curb gutter. Read More
Waterworld Alpine Springs Excavation
This project showcases our proficiency in water infrastructure enhancement. This project entailed the installation of 7,572 LF of water pipe ranging from 48" to 3" in size con... Read More
Potable Water Distribution Improvement
This project showcases our proficiency in water infrastructure enhancement. This project entailed laying down 25,000 feet of 4-inch HDPE (High-Density Polyethylene) fused wate... Read More
Well Site #6 Site Improvements
This project focused on constructing a meter vault for two Denver Basin wells. This involved excavation, concrete work, site piping, process piping, valves, hatches, and elect... Read More
Falcon Lift Station 2020 Improvement
The Falcon Lift Station 2020 Improvement project consisted of changes to the site. This added accommodations for dumping of sewer pump trucks and chemical delivery trucks. Thi... Read More
Bennett Ave. Water Main Replacement
This project involved the replacement of an existing water trunk line down the main street of Cripple Creek. This included 1,365 linear feet of PVC pipe ranging from 10" to 4"... Read More
S. Cascade Ave Over Cheyenne Run
Native Sun Construction achieved a structural and environmental milestone with the intricate removal and replacement of S. Cascade Avenue's concrete arch and pedestrian bridge... Read More
MGA Marriott Downtown Hotel
Native Sun Construction spearheaded the structural concrete for the notable mid-rise MGA Marriott hotel in Colorado Springs. Our project scope included the placement of over 5... Read More
Woodmen Hills Lift Station #1
This project entailed the development of a sewer lift station situated 30 feet underground. This project featured the construction of a wooden frame control house positioned a... Read More
The Ridge Apartments
New apartment complex in congested urban areas our scope included earthwork, stormwater, sewer, water and all concrete. Read More
School of Mines
This project consisted of adding a new maintenance building and addition to the staff offices for School of Mines in Golden Colorado. Native Sun was contracted by Fransen Pitt... Read More