Archives

Mesa Ridge & Syracuse St

Published by View Article<p>Earthwork utilities and street work for the new King Supers Grocery Store development.</p>
Concrete Road

Indiana Ave & Illinois Ave Railroad

Published by View Article<p>Building new roadway over the railway with surface level crossing systems, adding a traffic light at Santa Fe Ave intersection.</p>

PLSD Sewer Outfall

Published by View Article<p>The PLSD Sewer Outfall project was an emergency operation to fortify the Sanitary Sewer Crossing of Ice Cave Creek. A... <a class="view-article" href="https://www.nativesunusa.com/projects/plsd-sewer-outfall/"></a></p>

S Cheyenne Canyon Bridge Replacement

Published by View Article<p>Development of existing bridge structure and realign the creek and install new road out pedestrian bridges over Cheyenne Creek.</p>

Woodmoor Arapahoe Well No 22

Published by View Article<p>This project involved the installation of pumps and hardware in a previously drilled well, coupled with the construction of a... <a class="view-article" href="https://www.nativesunusa.com/projects/woodmoor-arapahoe-well-no-22/"></a></p>

West Fillmore Culvert Replacement

Published by View Article<p>Installation of new storm drain 72″ RCP pipe through Jacking and boring method underneath Fillmore Street in Colorado Springs. Includes... <a class="view-article" href="https://www.nativesunusa.com/projects/west-fillmore-culvert-replacement/"></a></p>

Granite Bridge Construction

Published by View Article<p>Demolition and rehabilitation of old bridge structure, adding riprap improving waterways over Arkansas River.</p>

CDOT Bailey US285 Safety Imp

Published by View Article<p>The project enhanced SH285’s safety by removing the existing median and curbs, installing a CDOT type 9 concrete barrier, adding... <a class="view-article" href="https://www.nativesunusa.com/projects/cdot-bailey-us285-safety-imp/"></a></p>