The PLSD Sewer Outfall project was an emergency operation to fortify the Sanitary Sewer Crossing of Ice Cave Creek. A recent flood event had exposed the existing pipe causing concern for potential water contamination. Our crews went in and removed the existing line, and installed a new line. This new line consisted of a 10″ PVC Carrier Pipe installed in a 20″ Steel Casing with 35′ deep drilled concrete piers as the foundations. We then reconstructed the creek bed with Rip-Rap reinforcing to prevent future water incursions. Following are some bullet points on this project.