Waterworld Alpine Springs Excavation

Waterworld Alpine Springs Excavation

Published by

This project showcases our proficiency in water infrastructure enhancement. This project entailed the installation of 7,572 LF of water pipe ranging from 48″ to 3″ in size connecting all the slides and rides in a water park. All these pipes had to be sloped perfectly to enable them to drain automatically when shut down. The engineering on this project was incomplete which necessitated a full redesign of the pipe pathways to deconflict them. Our teams performed all analysis and design required to install these lines correctly.

Categorised in: Uncategorized

This post was written by anava