Woodmen Hills Lift Station #1

Published by

This project entailed the development of a sewer lift station situated 30 feet underground. This project featured the construction of a wooden frame control house positioned above a wet and dry well-type basement, along with the installation of 12-inch sewer grinder pumps equipped with full redundancy and sophisticated SCADA control systems.